PRE-CONSTRUCTION
PREPARE TENANT IMPROVEMENT BUILDING FEASIBILITY STUDY
- Survey and prepare a detailed study of the demised area
- Prepare preliminary timelines for site comparison and space availability
- Prepare cost analysis of existing base building shell condition or existing conditions
- Prepare preliminary analysis of existing tenant requirements and future expansion needs
- Prepare preliminary construction budget through the services of a licensed interior contractor in conjunction with the clients preliminary space programming
- Complete multi-building feasibility study, including all related costs, to permit client to make a well-informed decision on site selection
ASSIST IN REVIEWING LEASE CRITERIA
- Review and advise tenant on space planning and construction document allowance
- Review and advise tenant on tenant improvement allowance
- Review and advise tenant on landlords work letter and finishes
- Compare rent commencement to preliminary critical path schedule
- Recommend move allowance
SELECT PROJECT CONSULTANTS: SPACE PLANNER AND PROGRAMMER, ARCHITECT, ENGINEER, AND GENERAL CONTRACTOR
- Recommend interior architectural team suitable to meet project requirements
- Monitor duration of architects time to complete programming through approved space plan
- Monitor duration of architect's and engineers time to complete working drawings from approved space plan
EVALUATE VENDORS BIDS AND NEGOTIATE CONTRACTS
- Periodic review of plans and specifications during the conceptual, schematic, and working drawing phase as developed by the interior designer, architect, and engineers
- Review design in terms of construction methods and specifications in conformance with state and local code
- Identify all long-lead specialty items and compare product availability within the project schedule or make recommendations on early release